What to Expect from the Timeline of Your New Home Construction
Building a new home is an exciting journey, but it’s important to understand the construction timeline so you know what to expect at each stage. From design to the final walkthrough, the process takes several months. Here’s a breakdown of what you can expect during your new home construction process.
Phase 1: Pre-Construction and Design
The first step in the new home construction Spokane WA process is the pre-construction phase, where you finalize your design, select materials, and obtain the necessary permits. This phase typically takes a few weeks to a couple of months.
Design and planning: Work with your builder to design your floor plan and choose materials that fit your style and needs.
Permitting: Secure permits to comply with local building codes and regulations. This ensures everything is legal and safe.
Once permits are in hand, you’re ready to move on to site preparation.
Phase 2: Site Preparation and Foundation
After securing permits, the site preparation and foundation phase begins. The land is cleared, leveled, and the foundation is laid, forming the base of your home.
Excavation and grading: Preparing the land to ensure a stable base for construction.
Foundation installation: The foundation is poured or set, depending on your home’s design.
This phase generally takes about 2-4 weeks, depending on weather and the type of foundation being used.
Phase 3: Framing and Roofing
Once the foundation is in place, the framing phase begins. This is where the structure of your home starts to take shape.
Framing: The skeleton of your home is built, including walls and roof structure.
Roofing: After framing, the roof is installed to protect the structure from weather.
This phase typically takes 4-6 weeks to complete, depending on the home’s size and design.
Phase 4: Interior Work and Finishes
With the structure complete, it’s time for interior work such as plumbing, electrical, HVAC, and insulation. This is also when your home begins to take on its final look with finishes.
Plumbing, electrical, and HVAC: Install plumbing pipes, electrical wiring, and HVAC systems.
Interior finishes: Drywall, flooring, cabinetry, countertops, and paint are added to complete the interior.
This phase usually takes 8-12 weeks, depending on the complexity and size of the home.
Phase 5: Final Walkthrough and Move-In
After the interior finishes are complete, the final inspection occurs. This is when you walk through the home with your builder to ensure everything meets your expectations.
Final inspection: Review the home to ensure everything is completed to your satisfaction.
Move-in: Once the inspection is done, your new home is ready for you to enjoy.
The final walkthrough and move-in process typically takes a few weeks to complete.
Start Your New Home Construction with Diamond Homes
New home construction for yourselfis always a rewarding process, and understanding the timeline helps you plan better. At Diamond Homes, we guide you through each step of the process, ensuring your dream home is built to perfection. Call (509) 998-0978 today to start your journey to a new custom home!